Ski-Ride logo
Homepage link
About Us link
FAQ
Contacts link
Ski Lifts IndexMain LibraryContents MenuNext Chapter
Ski lift symbol: button tow

LLOSADA BUTTON TOW

5 Minutes Journey761 m (833 yd) Long
700 Passengers/Hour
Sector:  El Tarter
Although not a difficult lift, overall, do beware of the vicious jolt at the steep start!
This tow provides uplift to the summit of the Tossal de la Llosada for all routes off that highest point in this sector, including links towards Soldeu and Grau Roig; as well as directly serving the Oreneta, Teixó and [upper] Guineu pistes descending parallel to the line of this lift.

On Arrival:  at the summit, dismount to the left for the Llop and Miguel runs or to U-turn back down parallel to the line of the tow to start the Oreneta, Teixó and/or Guineu pistes;  dismounting ahead-left and passing under the nearby 6-seater Llosada chairlift begins the [quite flat] long Gall de Bosc run;  dismounting ahead-right and skating/strolling above the chairlift terminals' level takes you to the start of the Solana runs and towards the Cortalets link-track for the quickest route towards Grau Roig.
Google
ski-ride.co.uk
Ski-Ride Travel Guides Logo
Ski Lifts tab
Llosada Button Tow
SKI-RIDE NEWSLETTER
Enter Your Email Address:

Subscribe Unsubscribe
Terms & Conditions | Copyright © 2005 Ski-Ride Productions. All Rights Reserved | Privacy Policy